For safety reasons the gates will have to remain closed and the site will stay inaccessible to the public during restoration.:
• Hedge and tree works have been completed before 1 March 2026 (start of nesting season).
Once ground levels between the Old School Field and existing Playing Field are resolved, a pedestrian access opened to link Church Lane and King’s Close with the Playing Field.
Work begins on hedge trimmimg Tuesday 6 Jaunuary 2026